
Featured Projects
“More than 2.000,000 meters of piles have been produced across our projects.”
Timișoara West Bypass Project
Nurol Construction
Romania Targu Mures – Targu Neamt, Section 1
Nurol Construction
Targu Mures – Targu Neamt, Section 2
Ozaltin Insaat
Sibiu – Pitesti Highway
Mapa – Cengiz JV
MAOG High Speed Railway Project
Oztunc Insaat
Antalya – Alanya Motorway BOT
Oztunc Insaat
Pestera Constanta Wind Turbine Project
Zublin Romania SRL
Joseni – Ditrau Lot 1D
Danlin XXL
MEDCEM Cement Silo Construction
Eren Holding A.Ş.
Romania Sibiu – Fagaras Highway
Makyol Insaat
Brasov–Targu Mures–Cluj–Oradea Motorway, Suplacu de Barcau 3B5
Nurol İnşaat ve Ticaret A.Ş.
Romania Buzau–Ploiesti Highway Lot 3
Nurol – Makyol Joint Venture
Izmir Cigli Tramway Project
Nurol Construction A.Ş.
Ordu Beltway Melet Viaduct Project
Nurol – YDA – Özka – Yüksel JV
Mugla – Kale Road Project
Sarıosmanoğlu Construction
Constanta Harbour Project
Zublin Romania SRL
İstanbul–İzmir Highway Km 73+400 Landslide Stabilization Project
OTOYOL A.Ş. – NOMAYG
Konya–Karaman Eyiste Viaduct Bored Pile Works
Nurol Construction A.Ş.
İzmir – İstanbul Highway Project (Viaduct 3, V5, V6, V7 & Structures Bored Pile Works)
Astaldi SPA
Gebze–Orhangazi–İzmir Highway & Balıkesir–Kırkağaç–Akhisar Zone Bored Pile Works
Nurol Construction A.Ş.
Ordu Beltway Landslide Stabilization Project
YDA Group A.Ş.
Mugla–Kale Road Landslide Stabilization Project
YDA Group A.Ş.
Afyonkarahisar Viaduct Deep Soil Mixing Project
YDA Group A.Ş.
Ankara Ulus Culture Convention Center & Car Park Project
YDA Group A.Ş.
Kızıldere 3 Geothermal Energy Power Plant Project
Zorlu Holding A.Ş.
Ankara – Sivas Railway Project Zone 1
YDA Group A.Ş.
Biga Kocabaş River Improvement Project – 3 Bored-Pile Bridges
DSİ 25th Regional Directorate
Devrek–Ereğli Road Landslide Stabilization Project
Bayburt Group A.Ş.
Balıkesir–Akhisar Road Landslide Stabilization Project
Demyol A.Ş.
Bartın Kirazlıköprü Dam Relocation Road Project
YDA Group A.Ş.
MEDCEM Cement Plant Road Landslide Stabilization Project
Eren Holding A.Ş.
İzmir Metropolitan Municipality Akıncılar Subway & Hilal Transfer Station
İzmir Metropolitan Municipality
Torbalı–Bayındır–Ödemiş–Kiraz Road Fetrek Group Bridges
Highways 2nd Regional Directorate / İzmir
North Marmara Highway Viaducts Project
İçtaş A.Ş. – Astaldi SPA
Aydın Başçayır Pond & Irrigation Project
DSİ 21st Regional Directorate
Akçay Street Interchanges (Tansaş–Sarnıç–Esbaş Subways) Project
İzmir Metropolitan Municipality
Afyonkarahisar Center Akarçay River Improvement Project
Özşa Construction & ENK Construction JV
Zonguldak Çaycuma Bridge Project
Highways 15th Regional Directorate / Kastamonu
Çanakkale–Ezine–Ayvacık Road İntepe Viaduct Project
Highways 14th Regional Directorate / Bursa
Ankara – Niğde Highway Project Km 73+000 / 3 Overpasses, 2 Viaducts, Pile & DSM Works
ERG Construction A.Ş.
Engineering Achievements
Deep Foundation Applications
We specialize in deep foundation applications such as bored piles, deep soil mixing (DSM), continuous flight auger (CFA) piles, diaphragm walls, stone columns and similar ground improvement systems.
Pile Head Breaking
Pile head breaking is the controlled removal of the upper part of the pile to expose sound concrete and reinforcement for a safe connection to the pile cap or foundation.
Bridges and Viaducts
We bring over 30 years of expertise in the design and construction of bridges and viaducts, delivering safe and durable structures in challenging ground and seismic conditions.